Plant 3
Plant 3

Plant 3

Plant 3 is established with the concept of manufacturing pharmaceuticals intermediaries and functional intermediaries, carbon bisulfide as a key material.


Plant 3 Main Equipments

Equipment

Material

Capacity

Qty

Remark

Chemical reactor

SUS316

3500L

1

2 layer jacket

Chemical reactor

SUS316

6000L

1

  

Chemical reactor

SUS316

10000L

1

  

Chemical reactor

SUS316

1000L

1

Faudora wings

Chemical reactor

GL

6000L

1

Full zone churning wings

Dripping tank

SUS316

1000L

1

Turbine wings(High temperature counteraction300 

Chemical reactor

SUS316

3000L

1

CS2,  fluid meter

Filtration dryer

SUS316

3000L2.0 

1

Churning wings/press filter

Filter Press

36Inch

9.89㎡/148L

1

600×600×22

Centrifugal separator

Afron

36Inch

2

Top discharge

Fractionating tower

SUS304

181L/H

1

Methanol/  theoretical plate number: 14 Layers

Exhaust gas treatment device

FRP

40m3/min

1

  

Cooling device

Cooling capacity 170KW

1

- 55 

Waste fluid processing tub

PE

6000L

2

Hypochlorous acid processing

 

Plant 3 is established with the concept of manufacturing pharmaceuticals intermediaries and functional intermediaries which makes carbon bisulfide a key material.
Copyright© 2010 Showa Kako Corp. All Rights Reserved.